ERDA Services

Electrical Research and Development Association offers prompt services with automated generation of test reports and parallel test setup resulting in a reduced waiting period. The present lab availability as of 8th May, 2023 is:

Immediate Test Date
  • Instrument Transformers (CT/PT) Testing
  • Lamps & Luminaire (LM 79 Testing) including solar lighting system
  • Motor & Pumps (up to 150HP) (including solar pumping system up to IOHP), Flameproof Enclosure Testing
  • Partial Discharge Testing upto 400 kV Products (Including Dry Type Transformers)
  • Impulse Testing of Power Transformers, Insulators, Isolators, Breakers, Bushings etc.
  • In house calibration facility for Instrument, CTPT, Optical, Medical Devices etc.
  • Appliance Testing (including wiring accessories and batteries)
  • EMI/EMC Testing
Within One Week
  • Conductors, Insulators, Hardware etc.
  • Testing of Liquid Insulating Material
  • Testing of Solid Insulating Material
  • Root Cause Analysis for various failed components
  • HTLS Conductor Testing
  • CRGO Testing
More Than One Week
  • Distribution Transformers (BIS & Non-BIS Inclusion Samples)
  • Short Circuit Testing Facility at Savli & Makarpura
  • Switchgear Testing Facility
  • Cable (Type and Acceptance) Testing
  • Energy Meter Testing Facility
  • Capacitor (Type Testing)

For Enquiries

Please contact at

Account details will be confirmed via email.